[1]
Simbolon, T. et al. 2020. THE IMPLEMENTATION OF 5S MANAGEMENT AT OFFSET UNIT: CASE STUDY AT PT PURRA BARUTAMA, KUDUS. Kreator. 7, 1 (Apr. 2020), 53–72. DOI:https://doi.org/10.46961/kreator.v3i1.300.